2026 BMW M5 VIN WBS83FK02TCW89898

2026 BMW M51 / 17

Specifications

Make
BMW
Model
M5
Year
2026
VIN
WBS83FK02TCW89898
Color
blue
Body Type
sedan
Engine
4.4l v-8 di, dohc, vvt, turbo, premium , 577hp
Transmission
automatic
Drivetrain
all
Fuel
hybrid

Auction & Listing Details

Auction
IAAI
Lot
45891342
Seller
Progressive
Location
medford, new york
Odometer
2,865 mi
Primary damage
Front & Rear
Condition
Does Not Run
Keys
Yes

What each position means

  1. WBSWorld Manufacturer IdentifierPosition 1–3BMW · Germany
  2. 83FK0Vehicle descriptor sectionPosition 4–8—
  3. 2Check digitPosition 9Matches
  4. TModel yearPosition 102026
  5. CAssembly plantPosition 11—
  6. W89898Production serial numberPosition 12–17—

Similar vehicles