2026 BMW M5 VIN WBS83FK02TCW67948

2026 BMW M51 / 16

Specifications

Make
BMW
Model
M5
Year
2026
VIN
WBS83FK02TCW67948
Color
black
Body Type
sedan
Engine
4.4l v-8 di, dohc, vvt, turbo, premium , 577hp
Transmission
automatic
Drivetrain
all
Fuel
hybrid

Auction & Listing Details

Auction
IAAI
Lot
46120871
Seller
AAA Missouri
Location
granite city, illinois
Odometer
8,786 mi
Primary damage
Left Side
Secondary damage
Unknown
Condition
Runs and Drives
Keys
Yes

What each position means

  1. WBSWorld Manufacturer IdentifierPosition 1–3BMW · Germany
  2. 83FK0Vehicle descriptor sectionPosition 4–8—
  3. 2Check digitPosition 9Matches
  4. TModel yearPosition 102026
  5. CAssembly plantPosition 11—
  6. W67948Production serial numberPosition 12–17—

Similar vehicles