2023 BMW M5
VIN WBS83CH02PCL74241
Specifications
- Make
- BMW
- Model
- M5
- Year
- 2023
- VIN
- WBS83CH02PCL74241
- Color
- blue
- Body Type
- sedan
- Engine
- 4.4l v-8 di, dohc, vvt, turbo, 600hp
- Transmission
- automatic
- Drivetrain
- all
- Fuel
- gasoline
Auction & Listing Details
- Auction
- IAAI
- Lot
- 38306745
- Title
- Wait Title
- Seller
- Progressive
- Sale date
- 2024-02-05
- Final bid
- $37,475
- Odometer
- 7,297 mi
- Primary damage
- Left Front
- Condition
- Does Not Run
- Keys
- Yes
What each position means
- WBSWorld Manufacturer IdentifierPosition 1–3BMW · Germany
- 83CH0Vehicle descriptor sectionPosition 4–8—
- 2Check digitPosition 9Matches
- PModel yearPosition 102023
- CAssembly plantPosition 11—
- L74241Production serial numberPosition 12–17—