2023 BMW M5 VIN WBS83CH00PCL59348

2023 BMW M51 / 18

Specifications

Make
BMW
Model
M5
Year
2023
VIN
WBS83CH00PCL59348
Color
green
Body Type
sedan
Engine
4.4l v-8 di, dohc, vvt, turbo, premium , 617hp
Transmission
automatic
Drivetrain
all
Fuel
gasoline

Auction & Listing Details

Auction
IAAI
Lot
46159799
Seller
Progressive
Odometer
29,151 mi
Primary damage
Front & Rear
Keys
Yes

What each position means

  1. WBSWorld Manufacturer IdentifierPosition 1–3BMW · Germany
  2. 83CH0Vehicle descriptor sectionPosition 4–8—
  3. 0Check digitPosition 9Matches
  4. PModel yearPosition 102023
  5. CAssembly plantPosition 11—
  6. L59348Production serial numberPosition 12–17—

Similar vehicles